Project Description: The Structural Division of C.S. Davidson, Inc. provided the historical recordation document for the removal of the previous bridge. The old structure was replaced with a 50 foot span prestressed concrete bridge. The firm obtained approval from the York County Conservation District and PA Department of Environmental Protection (DEP) and also obtained structural adequacy approval from PA DOT. The survey, structural design, and contract documents were also completed by C.S. Davidson, Inc. Contract administration and inspection services, as well, were done by the firm. |