Project Description: C.S. Davidson, Inc., municipal engineer of record for Dover Township designed the reconstruction of approximately 8,500 linear feet of Butter Road by adding stone base on top of existing pavement, plus reclaiming the stone and existing pavement to form the new base course. Bituminous binder course (3") was placed down with the intent of overlaying it with wearing course next year (2001). The concrete bridge deck over Fox Run was also replaced and 1,000 linear feet of base drain was added to the existing storm sewer system to prevent flooding. |