This project involved the construction of a new floating intake structure and 4.6 MGD pumping station that sends raw water to a newly constructed 2500 square-foot chemical pretreatment tank. The floating intake structure entails a unique design that allows it to withdrawal water at various depths in the reservoir, while other interesting aspects such as a boat launch and dock were additional features of this project. C.S. Davidson, Inc. was responsible for the civil, electrical, and structural design services and the construction inspection. |